Changelog smartProject – Release 44
Released: 2022-08-16
App Version: 20.0.5587.6
ID 15088
ID | Type | Area | Title | External reference |
---|---|---|---|---|
15088 | Feature | smartProject | Registration of flextime hours | 7469 |
Details

- Flextime hours can be set not only to 0, but also to other values
- No direct posting (changing before posting) of flextime hours
- Requests must be approved
- Transaction should be able to be canceled
- Cancellability exists via pay-out requests
- Period for zeroing flextime hours (weekly, monthly, quartly, yearly)
- Setting is done via request page in report for suggesting lines
- Please note! Further information on handling can be found in separate documentation
ID 15126
ID | Type | Area | Title | External reference |
---|---|---|---|---|
15126 | Issue | smartProject | No time registration possible | 7439 |
Details

- The problem can be reproduced with the following data constellation:
- Project budget line created with a quantity of 40 and unit of measure in Hours.
- Schedule -> Used Get Lines function (line with unit of measure Hours and quantity of 40 is added to the schedule)
- Work assignment is created for the line in the schedule
- after that the unit of measure was changed from Hours to Days as well as the quantity in the project budget and the work assignment
- a problem occured with the conversion, which led to problems with the time registration.
ID 15157
ID | Type | Area | Title | External reference |
---|---|---|---|---|
15157 | Issue | smartProject | Activity Description “Activity Report” | 7540 |
Details

- The determination of the activity description was corrected in the “Activity Report” report.
ID 15200
ID | Type | Area | Title | External reference |
---|---|---|---|---|
15200 | Issue | smartProject | Translation adjusted in the project risk assessment lines. | – |
Details

- The heading “General” has been translated correctly (DEU/ENU).
ID 15202
ID | Type | Area | Title | External reference |
---|---|---|---|---|
15202 | Issue | Ressources | Unit prices in the resource card | – |
Details

- The unit price in the resource card was not calculated automatically when the “Overhead” and “Overhead %” were entered.
ID 15207
ID | Type | Area | Title | External reference |
---|---|---|---|---|
15207 | Issue | smartProject | Invoiceable Type is lost in the project budget line | – |
Details

- In the Contract Type Code field on the project card, the Invoiceable Type field can be preset so that this data is transferred in the project budget line
- If a contract type code is selected in which the invoiceable type “Fix” is stored, the invoiceable type is transferred to the project budget lines
- If a contract type code is selected in which the invoiceable type “Variable” is stored, the invoiceable type is transferred to the project budget lines
- If a new project budget line is created with the line type “Position”, then the invoiceable type from the project's contract type code is copied into the line.
- If a new project budget line is created with the line type "Component", then the invoiceable type from the parent “Position” is copied into the line.
- If the sales price of the budget line is 0, then the “Invoiceable Type” field will be set to blank.
ID 15209
ID | Type | Area | Title | External reference |
---|---|---|---|---|
15209 | Issue | smartProject | Position headings are generated incorrectly or not at all when invoices are created | – |
Details

- the position headings were only partially created during invoicing.
ID 15229
ID | Type | Area | Title | External reference |
---|---|---|---|---|
15229 | Issue | smartProject | Incorrect billing for change of address | – |
Details

- When changing address data in the customer, a function is activated which automatically makes the changes in the projects.
- This functionality has been revised so that address changes are correctly reflected in smartProject
ID 15236
ID | Type | Area | Title | External reference |
---|---|---|---|---|
15236 | Issue | smartProject | Direct unit cost is not determined correctly in the schedule line | – |
Details

- The direct unit cost was not automatically determined in the schedule line after resources were assigned as arrangers to the schedule lines
- The functionality has been revised so that the direct unit cost in the schedule line is always updated automatically
ID 15273
ID | Type | Area | Title | External reference |
---|---|---|---|---|
15273 | Issue | smartProject | Selection total project number | 7579 |
Details

- Extended description texts can be entered on the total project card
- Extended description texts are saved correctly
- Extended description texts are displayed correctly without error message
- the Total Project List page can be opened without errors