    Changelog smartProject – Release 44

    Released: 2022-08-16
    App Version: 20.0.5587.6

    ID 15088

    ID Type Area Title External reference
    15088 Feature smartProject Registration of flextime hours 7469

    Details

    • Flextime hours can be set not only to 0, but also to other values
    • No direct posting (changing before posting) of flextime hours
      • Requests must be approved
    • Transaction should be able to be canceled
      • Cancellability exists via pay-out requests
    • Period for zeroing flextime hours (weekly, monthly, quartly, yearly)
      • Setting is done via request page in report for suggesting lines
    • Please note! Further information on handling can be found in separate documentation

    ID 15126

    ID Type Area Title External reference
    15126 Issue smartProject No time registration possible 7439

    Details

    • The problem can be reproduced with the following data constellation:
      • Project budget line created with a quantity of 40 and unit of measure in Hours.
      • Schedule -> Used Get Lines function (line with unit of measure Hours and quantity of 40 is added to the schedule)
      • Work assignment is created for the line in the schedule
      • after that the unit of measure was changed from Hours to Days as well as the quantity in the project budget and the work assignment
      • a problem occured with the conversion, which led to problems with the time registration.

    ID 15157

    ID Type Area Title External reference
    15157 Issue smartProject Activity Description “Activity Report” 7540

    Details

    • The determination of the activity description was corrected in the “Activity Report” report.

    ID 15200

    ID Type Area Title External reference
    15200 Issue smartProject Translation adjusted in the project risk assessment lines. –

    Details

    • The heading “General” has been translated correctly (DEU/ENU).

    ID 15202

    ID Type Area Title External reference
    15202 Issue Ressources Unit prices in the resource card –

    Details

    • The unit price in the resource card was not calculated automatically when the “Overhead” and “Overhead %” were entered.

    ID 15207

    ID Type Area Title External reference
    15207 Issue smartProject Invoiceable Type is lost in the project budget line –

    Details

    • In the Contract Type Code field on the project card, the Invoiceable Type field can be preset so that this data is transferred in the project budget line
      • If a contract type code is selected in which the invoiceable type “Fix” is stored, the invoiceable type is transferred to the project budget lines
      • If a contract type code is selected in which the invoiceable type “Variable” is stored, the invoiceable type is transferred to the project budget lines
      • If a new project budget line is created with the line type “Position”, then the invoiceable type from the project's contract type code is copied into the line.
      • If a new project budget line is created with the line type "Component", then the invoiceable type from the parent “Position” is copied into the line.
      • If the sales price of the budget line is 0, then the “Invoiceable Type” field will be set to blank.

    ID 15209

    ID Type Area Title External reference
    15209 Issue smartProject Position headings are generated incorrectly or not at all when invoices are created –

    Details

    • the position headings were only partially created during invoicing.

    ID 15229

    ID Type Area Title External reference
    15229 Issue smartProject Incorrect billing for change of address –

    Details

    • When changing address data in the customer, a function is activated which automatically makes the changes in the projects.
      • This functionality has been revised so that address changes are correctly reflected in smartProject

    ID 15236

    ID Type Area Title External reference
    15236 Issue smartProject Direct unit cost is not determined correctly in the schedule line –

    Details

    • The direct unit cost was not automatically determined in the schedule line after resources were assigned as arrangers to the schedule lines
      • The functionality has been revised so that the direct unit cost in the schedule line is always updated automatically

    ID 15273

    ID Type Area Title External reference
    15273 Issue smartProject Selection total project number 7579

    Details

    • Extended description texts can be entered on the total project card
      • Extended description texts are saved correctly
      • Extended description texts are displayed correctly without error message
    • the Total Project List page can be opened without errors

    ☀
    ☾