Changelog smartProject – Release 78
Released: 2024-03-24
App Version: 23.4.14.869.11
ID 16237
ID | Type | Area | Title | External reference |
---|---|---|---|---|
16237 | Problem | smartProject | Correct errors in the performance record | 7750 |
Details

- The performance record report does not have a consecutive page number, "1" is displayed on each page.
- This has been fixed. The report Performance record has been corrected and the consecutive page number is displayed.
ID 19467
ID | Type | Area | Title | External reference |
---|---|---|---|---|
19467 | Problem | smartProject | Remaining vacation 3 decimal places | 9191 |
Details

- The calculated vacation in the Web-ZE is partially displayed with 3 decimal places.
- This has been fixed.
- In the leave registration it is possible to enter leave changes with max. 3 decimal places
- In the leave overview, a maximum of 3 decimal places are displayed for the leave days
- This has been fixed.
ID 20060
ID | Type | Area | Title | External reference |
---|---|---|---|---|
20060 | Feature | smartProject | future projects | 9703 |
Details

- The booking of hours to the stored general projects should not already take place for future days, but only at the end of the day or the last booking on the day.
- The requirement has been implemented.
- If general projects are assigned to an employee, it is not possible to record future times to the general project. The assignment of general projects only works on the working date in the past. If a leave request has already been entered in a general project in the future and this is canceled, the assignment to the general project is also deleted and this day is not assigned to a general project in the calendar (if the date of the entered leave is before the working date).
- The requirement has been implemented.
ID 20661
ID | Type | Area | Title | External reference |
---|---|---|---|---|
20661 | Problem | smartProject | General projects | 9702 |
Details

- 3 project lines are stored in the relevant resource in the daily recording due to the setting as a general project. There should only be 1 line.
- This has been fixed.
- Procedure:
- open search
- enter "Basic settings"
- select "Project - Determine basic setting ZE"
Figure: Search - Project - Determine basic setting ZE - enter Start period and End period in the mask
- in Filter: Employees, select the employee(s) for whom the basic settings are to be redetermined
- Confirm the entry with **OK
- The Basic settings are then redetermined
Figure: Project - Determine basic setting ZE
- Procedure:
- This has been fixed.
ID 20872
ID | Type | Area | Title | External reference |
---|---|---|---|---|
20872 | Problem | smartProject | Calculation of active users per license type |
Details

- There are currently problems with the calculation of active users per license type.
The License type field on the User always seems to be set to Full user regardless of the license type (Essential, TeamMember, Premium).
As a result, there is currently no differentiation in the calculation between Full Users (Essential, Premium) and TeamMember.
The assignment of Users to the License Plans takes place in the User Plan table.
However, this is blocked for access via extension. An alternative solution must be found here
- This has been solved so that the calculation of active users per license type is correct.
ID 20806
ID | Type | Area | Title | External reference |
---|---|---|---|---|
20806 | Problem | smartProject | Open project budget for completed or closed projects | 9374 |
Details

- The project budget of completed or closed projects cannot be opened.
- This has been fixed.
- The status filters can be set without an error message. When creating a new project task, only projects with the status Completed are displayed, a manual entry of the Project number in the status Completed is possible.
- This has been fixed.
ID 20883
ID | Type | Area | Title | External reference |
---|---|---|---|---|
20883 | Feature | smartProject | MSDBC21 // OPOS ID 343 - Desired delivery date in order | 9781 |
Details

- the information from the start date is not transferred from the project budget to the due date in the *order worksheets
- This has been resolved.
- The start date from the project budget is transferred to the purchase order worksheets in the due date field for subsequent processing and then to the purchase order in the requested goods receipt date field.
- This has been resolved.